Technical re-equipment of the workshop

кран-балка подвесная г/п 3,2т

One of our regular partners asked to do the impossible – to design, manufacture and assemble the crane trestles and two single-girder bridge suspended forklifts (3,2t) without stopping the production. And they came to the right place.

The MKS designers in the shortest possible time have developed a three-dimensional project, and then the drawings, which went into production. Thus, all the preparatory works took only 20 working days. Our installers installed a crane track with a total length of 70 meters, of which a crane trestle of 10 meters each, which made it possible to move the load from the workshop to the street and load it onto a motor transport without using auxiliary lifting mechanisms.

кран-балка подвесная

When manufacturing the cranes, traditionally Bulgarian hoists, European-made electrical components and the MKS radio control were used. According to the developed project, the crane trestle was covered with profiled flooring.

All installation works were carried out without truck cranes, autotowers and other vehicles from side, which significantly accelerated and cheapened the works. In addition, these works were completed on a turnkey basis in the second and third shifts, which allowed the Customer to complete the production and shipment plan.

We can safely say that there are no impossible tasks! Contact us with any projects, and we will help you find a solution even from a hopeless situation.